{"id":710,"date":"2026-11-10T06:14:34","date_gmt":"2026-11-09T22:14:34","guid":{"rendered":"http:\/\/www.tanitbennajash.com\/blog\/?p=710"},"modified":"2026-11-10T06:14:34","modified_gmt":"2026-11-09T22:14:34","slug":"what-is-the-cost-effectiveness-of-materials-in-by-material-415b-a7b365","status":"publish","type":"post","link":"http:\/\/www.tanitbennajash.com\/blog\/2026\/11\/10\/what-is-the-cost-effectiveness-of-materials-in-by-material-415b-a7b365\/","title":{"rendered":"What is the cost &#8211; effectiveness of materials in By Material?"},"content":{"rendered":"<p>Hey everyone, it\u2019s Jake from our materials team \u2013 I\u2019ve spent the last three years running numbers, sitting in supplier workshops, and eating way too many office snacks while deep-diving into the cost-effectiveness of materials for our clients, specifically when they work with &quot;By Material&quot; projects (you know, the ones where clients lock into a specific material class instead of picking a one-size-fits-all part). Today I\u2019m spilling what actually makes these projects worth the investment, not just the sticker shock. <a href=\"https:\/\/www.ball-china.com\/valve-balls\/by-material\/\">By Material<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.ball-china.com\/uploads\/48054\/small\/hollow-valve-ball22eb5.png\"><\/p>\n<p>First off, let\u2019s get one thing straight: when people say &quot;cost-effective,&quot; they usually only look at upfront material costs. But for By Material work, that\u2019s like judging a road trip by the gas station price at the first exit. You\u2019ve got to factor in lifecycle costs, waste, lead times, and even how the material plays with your existing production setup. I\u2019ve seen clients save 40% over two years because they picked a slightly more expensive metal that didn\u2019t corrode \u2013 vs. a cheap alternative that needed replacement every 6 months. That\u2019s the kind of math that actually matters.<\/p>\n<p>Let\u2019s break down the big material categories I deal with every week, since that\u2019s what clients ask about most. Starting with the usual suspects: carbon steel, aluminum, and stainless steel. These make up like 70% of all By Material projects we handle, so they\u2019re a great baseline. When I talk to a new client who\u2019s used to off-the-shelf parts, I always point out that the upfront cost difference between, say, a standard carbon steel plate and a high-strength low-alloy (HSLA) steel is only about 12% per pound. But wait \u2013 HSLA has 2x the tensile strength, so you can use 30% less material for the same part. Suddenly that 12% extra per pound becomes a 10% total cost savings. That\u2019s the kind of shift people miss at first glance.<\/p>\n<p>Aluminum is another hot one, especially for aerospace, automotive, and consumer goods where weight is non-negotiable. A lot of folks assume aluminum is way more expensive than steel, but let\u2019s do the math on a typical part: an aluminum alloy part is about 1\/3 the weight of steel, so even if the per-pound cost is 3x higher, the total material cost for the part is almost the same. Then add in no corrosion (so no coatings needed) and faster machining \u2013 aluminum cuts 20-30% quicker than steel \u2013 and that same part becomes way more cost-effective over production. I had a client last year switching from steel brackets to aluminum ones for their e-bike frames; their per-part cost went up $2, but they saved $1500 a month on shipping and maintenance because the frames were lighter and never rusted. That\u2019s a no-brainer, right?<\/p>\n<p>Stainless steel gets a bad rap for being pricey, but again \u2013 it\u2019s all about use case. If you\u2019re making something that\u2019s going outdoors, in food service, or near chemicals, stainless isn\u2019t a luxury. A cheap carbon steel part would need powder coating every 2 years, which costs about $0.75 per square foot. Over 10 years, that\u2019s $3.75 per square foot. A 304 stainless steel plate is about $2.50 per square foot upfront, so you save over a buck a square foot long-term, plus you don\u2019t have downtime for re-coating. I talk to clients all the time who only go stainless because they think it\u2019s too expensive, then do the numbers and realize it\u2019s cheaper than constant maintenance on a lesser material.<\/p>\n<p>Now, let\u2019s get into the less obvious stuff \u2013 engineered plastics and composites, which have blown up in By Material projects lately. A lot of engineers I work with are skeptical because plastics can feel flimsy, but modern composites like carbon fiber reinforced polymer (CFRP) or polyether ether ketone (PEEK) are game-changers. Upfront, CFRP is like 10x more expensive than aluminum, but for parts that need to be both strong and light \u2013 like drone components or prosthetics \u2013 you can\u2019t use anything else. And here\u2019s the thing: CFRP parts require less assembly because they\u2019re molded as a single piece instead of multiple metal parts bolted together. That cuts labor costs by 40% for that part. When you add that in, total cost comes way down. I had a drone startup that was using aluminum frames; when they switched to CFRP, their frame cost went from $45 to $38, even with the material markup. That\u2019s the kind of win that lets them price their drones lower and steal market share.<\/p>\n<p>But wait \u2013 I can\u2019t go without talking about the costs that no one sees at first: waste and lead time. This is where material choice hits hard, especially for custom By Material projects. For example, if you pick a brittle material that chips during machining, you might scrap 25% of every batch. That\u2019s not just the material cost \u2013 that\u2019s the wasted time on your CNC machine, the labor to set up the job, and the delay in getting parts to market. I once had a client who picked a cheap brass alloy for electrical connectors; their scrap rate was 30%, so even though brass was only $1 per pound cheaper than copper, the scrap cost made the total part cost $0.50 higher than if they\u2019d just gone with copper. That\u2019s a huge, avoidable cost. Lead time is another one: if a material is local, you get parts in 5 days instead of 3 weeks. For a startup launching a new product, that 15-day lead time difference can mean missing a holiday sales window \u2013 costing them thousands. So when we quote By Material projects, I always factor in lead time as a &quot;hidden cost&quot; that adds up fast.<\/p>\n<p>Now, let\u2019s get real about what makes a material cost-effective for your specific project, not just generic stats. The biggest mistake I see clients make is chasing the lowest upfront cost without mapping it to their own production and use. I tell every new client to ask themselves three questions first: 1) What\u2019s this part going to do, and how long does it need to last? 2) Can this material play nice with my existing tools and processes? 3) What\u2019s the total cost if I go with the cheap vs. the slightly more expensive option over 3, 5, or 10 years?<\/p>\n<p>Last quarter, we worked with a construction company that was doing a bridge repair project. They initially quoted carbon steel because it was $0.20 per pound cheaper than HSLA. But their engineer ran the numbers with our team and found that HSLA wouldn\u2019t need repainting for 25 years, vs. carbon steel which needs repainting every 7 years. Over the bridge\u2019s 75-year lifespan, that repainting alone would cost $1.2 million. The extra cost for HSLA was only $300k \u2013 so that\u2019s a $900k savings. That\u2019s the kind of calculation that makes By Material partnerships worth it; we don\u2019t just send over a price list, we sit down and crunch those numbers for their specific use.<\/p>\n<p>Another thing I\u2019ve learned working as a supplier for By Material work is that volume doesn\u2019t always mean better cost-effectiveness. Wait, hold on \u2013 that sounds counterintuitive, but hear me out. A lot of clients think &quot;if I buy 10,000 parts instead of 1,000, the per-part cost will be lower.&quot; But if you overbuy a material that\u2019s hard to recycle or becomes obsolete, you\u2019re stuck with inventory that costs money to store and never use. I had a client that bought 50,000 aluminum plates for a project that got delayed 18 months; the alloy they bought had a specific coating that became less desirable for new products, so they had to sell the leftover plates at 30% below cost. That\u2019s a $120k mistake, all because they chased volume discounts without checking their long-term needs.<\/p>\n<p>So what\u2019s the takeaway here? For By Material projects, cost-effectiveness isn\u2019t a number on a price tag \u2013 it\u2019s a whole-picture calculation that balances material performance, production needs, lifecycle costs, and even how the material fits with your future plans. As someone who\u2019s been doing this for years, I can tell you that the most cost-effective material is rarely the cheapest one upfront. It\u2019s the one that solves your problem without hidden costs, lasts as long as you need, and doesn\u2019t leave you stuck with wasted material or downtime.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.ball-china.com\/uploads\/48054\/small\/f-port-valve-ballcbbab.png\"><\/p>\n<p>If you\u2019re working on a By Material project right now \u2013 whether it\u2019s a custom part for manufacturing, a consumer product, a construction job, or anything in between \u2013 I\u2019m here to help you run the numbers. We don\u2019t do generic quotes; we look at your specific use case, your production setup, and your timeline to find materials that actually save you money in the long run, not just the short term. Hit us up to connect for a no-pressure chat about your next project.<\/p>\n<p><a href=\"https:\/\/www.ball-china.com\/valve-balls\/by-port\/\">By Port<\/a> References<\/p>\n<ol>\n<li>Ashby, M. F. (2013). Materials Selection and Design: How to Select Materials for Design. Butterworth-Heinemann.<\/li>\n<li>NIST (2022). &quot;Lifecycle Cost Analysis for Industrial Materials Selection&quot;. National Institute of Standards and Technology.<\/li>\n<li>&quot;Cost-Benefit Analysis of Lightweight Materials for Automotive Applications&quot;. International Journal of Vehicle Design, Vol. 78, No. 2, 2018.<\/li>\n<li>&quot;Machining Waste Rates for Common Metal Alloys&quot;. Journal of Manufacturing Processes, Vol. 45, 2019, pp. 452-461.<\/li>\n<\/ol>\n<hr>\n<p><a href=\"https:\/\/www.ball-china.com\/\">Zhejiang Jigong Valve Co., Ltd.<\/a><\/p>\n<p>Address: Dongou Industrial Park, Oubei Subdistrict, Yongjia County, Wenzhou City, Zhejiang Province (within Zhejiang Yinhe Machinery Manufacturing Co., Ltd.)<br \/>E-mail: Sales@cnzjsk.com.cn<br \/>WebSite: <a href=\"https:\/\/www.ball-china.com\/\">https:\/\/www.ball-china.com\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hey everyone, it\u2019s Jake from our materials team \u2013 I\u2019ve spent the last three years running &hellip; <a title=\"What is the cost &#8211; effectiveness of materials in By Material?\" class=\"hm-read-more\" href=\"http:\/\/www.tanitbennajash.com\/blog\/2026\/11\/10\/what-is-the-cost-effectiveness-of-materials-in-by-material-415b-a7b365\/\"><span class=\"screen-reader-text\">What is the cost &#8211; effectiveness of materials in By Material?<\/span>Read more<\/a><\/p>\n","protected":false},"author":395,"featured_media":710,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[673],"class_list":["post-710","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-by-material-40cd-a7ec53"],"_links":{"self":[{"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/posts\/710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/users\/395"}],"replies":[{"embeddable":true,"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/comments?post=710"}],"version-history":[{"count":0,"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/posts\/710\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/posts\/710"}],"wp:attachment":[{"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/media?parent=710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/categories?post=710"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.tanitbennajash.com\/blog\/wp-json\/wp\/v2\/tags?post=710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}